With this supply, there are already three delivered to the same mining operation, thus complementing another two manufactured in 2012.
This system is contemplated in the plant expansion project with a new leaching stage. The sampling station is composed of two stages, the primary with a cross cutter and the secondary with a rotatory cutter Vezin type. It also includes hydraulic engineering and mechanical design such as: transfer boxes, general arrangement plans, 3D models, development of control and force plans. The control of the system is done through a PLC that is inside a board that is also part of the supply.